This was taken in the very early stages of the setup. Probably mid November or so. I had to build the arches twice, as the first time I used 3/4 inch PVC. They collapsed. They were redone with 1 1/2 inch and then were quite strong. In 2004, we will be adding fencing to the other side of the drive. We ran out of time this year.
|

|
|

|
These three were taken on lightup night. Unfortunately, that's all the photos I have of 2003. I'll have to make a point in the future of taking more pictures during the setup and take down.
|

|
|